{"id":1911,"date":"2018-01-03T16:39:28","date_gmt":"2018-01-03T21:39:28","guid":{"rendered":"http:\/\/www.albrechtengineering.com\/?page_id=1911"},"modified":"2022-06-21T16:57:11","modified_gmt":"2022-06-21T20:57:11","slug":"wssc-projects","status":"publish","type":"page","link":"https:\/\/www.albrechtengineering.com\/index.php\/recent-projects\/environmental\/wssc-projects\/","title":{"rendered":"Washington Suburban Sanitary Commission Projects"},"content":{"rendered":"<p><img loading=\"lazy\" class=\"alignleft wp-image-1912\" src=\"https:\/\/www.albrechtengineering.com\/wp-content\/uploads\/2018\/01\/dc.jpg\" alt=\"dc\" width=\"822\" height=\"188\" srcset=\"https:\/\/www.albrechtengineering.com\/wp-content\/uploads\/2018\/01\/dc.jpg 660w, https:\/\/www.albrechtengineering.com\/wp-content\/uploads\/2018\/01\/dc-300x68.jpg 300w\" sizes=\"(max-width: 822px) 100vw, 822px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>Green Branch Waste Water Pumping Station<\/li>\n<li>Cabin Branch Waste Water Pumping Station<\/li>\n<li>Constructability Review of the Little Anacostia Waste Water Pumping Station<\/li>\n<li>Structural Design for Upgrades to Five WSSC Depots<\/li>\n<li>Maryland Science and Technology Center Waste Water Pumping Station<\/li>\n<li>Piscataway Waste Water Treatment Plant Effluent Filters<\/li>\n<li>Piscataway Water Resource Recovery Facility Raw Pumping Station Replacement<\/li>\n<li>Western Branch Waste Water Treatment Plant Tertiary Filter Assessment and Refurbishment<\/li>\n<li>Western Branch Water Resource Recovery Facility Tertiary Filter Design<\/li>\n<li>Western Branch Waste Water Treatment Plant Splitter Box Replacement<\/li>\n<li>Western Branch Water Resource Recovery Facility Splitter Box Design and Replacement<\/li>\n<li>Pepco Pressure Relief Vault Replacement<\/li>\n<li>Pumpkin Hill Waste Water Pumping Station Pump Replacement<\/li>\n<li>Western Branch Water Resource Recovery Facility Splitter Box Replacement<\/li>\n<li><a href=\"https:\/\/www.albrechtengineering.com\/index.php\/piscataway-bio-energy-facilities\/\"><strong>Piscataway Bioenergy Facilities Design Build<\/strong><\/a><\/li>\n<li>Waste Water Pumping Stations &#8211; Small Package Evaluations<\/li>\n<li>PDD Technical Expert Services X<\/li>\n<li>Sunflower Drive Water Main Replacement Water Main Design Support and Construction Inspection<\/li>\n<li>Locust Ave Water Main Replacement Water Main Design Support and Construction Inspection<\/li>\n<li>Righters Mill Water Main Replacement Water Main Design and Construction Inspection<\/li>\n<li>Buckler Road Water Main Replacement Water Main Design Support and Construction Inspection<\/li>\n<li>Woodyard Road Large Valve Vault &#8211; Water Main Design and Construction Inspection<\/li>\n<li>Southern Zone Large Meter Vault Replacement\u00a0 Water Main Design and Construction Inspection<\/li>\n<li>Large Meter Vault Replacement &#8211; Water Main Design and Construction Inspection<\/li>\n<li>Middleboro Drive Water Main Replacement &#8211; Water Main Design\u00a0and Construction Inspection<\/li>\n<li>College Gardens Water Main Replacement &#8211; Water Main Design\u00a0and Construction Inspection<\/li>\n<li>Beaufort Place Water Main Replacement &#8211; Water Main Design and Construction Inspection<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Green Branch Waste Water Pumping Station Cabin Branch Waste Water Pumping Station Constructability Review of the Little Anacostia Waste Water Pumping Station Structural Design for Upgrades to Five WSSC Depots Maryland Science and Technology Center Waste Water Pumping Station Piscataway Waste Water Treatment Plant Effluent Filters Piscataway Water Resource Recovery Facility Raw Pumping Station [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":695,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/1911"}],"collection":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=1911"}],"version-history":[{"count":11,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/1911\/revisions"}],"predecessor-version":[{"id":3139,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/1911\/revisions\/3139"}],"up":[{"embeddable":true,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/695"}],"wp:attachment":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=1911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}