{"id":1447,"date":"2017-05-12T14:51:55","date_gmt":"2017-05-12T18:51:55","guid":{"rendered":"http:\/\/www.albrechtengineering.com\/?page_id=1447"},"modified":"2020-12-10T11:21:25","modified_gmt":"2020-12-10T16:21:25","slug":"wra-dc-water-division","status":"publish","type":"page","link":"https:\/\/www.albrechtengineering.com\/index.php\/services\/construction-management-2\/wra-dc-water-division\/","title":{"rendered":"D.C. Water Division D: JBAB Diversion and Overflow Structures"},"content":{"rendered":"<p><strong>Project Owners Name: <\/strong><br \/>\nDC Water and Sewer Authority<br \/>\n<strong>Construction Cost:<\/strong><br \/>\n$46,000,000<br \/>\n<strong>Completion Date: <\/strong><br \/>\n2018<\/p>\n<p>This design build project consists of the construction of a diversion chamber, and overflow structure, and an odor control facility. Our scope of work included the design of a buried odor control facility adjacent to an existing concrete drop shaft structure and design of a new concrete cover and internal structures for the drop shaft. Prepared plans and specifications, reviewed shop drawing submittals, and responded to contractor&#8217;s RFIs. All design performed was in accordance with drawings and specifications provided by the Owner.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-full wp-image-1724\" src=\"https:\/\/www.albrechtengineering.com\/wp-content\/uploads\/2017\/05\/Water.jpg\" alt=\"Water\" width=\"1200\" height=\"1400\" srcset=\"https:\/\/www.albrechtengineering.com\/wp-content\/uploads\/2017\/05\/Water.jpg 1200w, https:\/\/www.albrechtengineering.com\/wp-content\/uploads\/2017\/05\/Water-257x300.jpg 257w, https:\/\/www.albrechtengineering.com\/wp-content\/uploads\/2017\/05\/Water-877x1024.jpg 877w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Owners Name: DC Water and Sewer Authority Construction Cost: $46,000,000 Completion Date: 2018 This design build project consists of the construction of a diversion chamber, and overflow structure, and an odor control facility. Our scope of work included the design of a buried odor control facility adjacent to an existing concrete drop shaft structure [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":1101,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/1447"}],"collection":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=1447"}],"version-history":[{"count":14,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/1447\/revisions"}],"predecessor-version":[{"id":2592,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/1447\/revisions\/2592"}],"up":[{"embeddable":true,"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/1101"}],"wp:attachment":[{"href":"https:\/\/www.albrechtengineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=1447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}