D.C. Water Division D: JBAB Diversion and Overflow Structures

Project Owners Name:
DC Water and Sewer Authority
Construction Cost:
$46,000,000
Completion Date:
2018

This design build project consists of the construction of a diversion chamber, and overflow structure, and an odor control facility. Our scope of work included the design of a buried odor control facility adjacent to an existing concrete drop shaft structure and design of a new concrete cover and internal structures for the drop shaft. Prepared plans and specifications, reviewed shop drawing submittals, and responded to contractor’s RFIs. All design performed was in accordance with drawings and specifications provided by the Owner.

Water